An AEC firm working on a coal handling facility needed to meet an aggressive schedule without compromising fabrication accuracy. Treknocom provided round-the-clock design support and optimized structural layouts to reduce material waste and improve build efficiency.
AutoCAD, Advance Steel
With the pressure of EPC deadlines and multiple contractors involved, the Client needed a partner to keep up with high-volume output and suggest innovative improvements.
Treknocom assembled a multi-member design team and operated on a shift model.
This engagement was successful because Treknocom was able to provide round-the-clock engineering output, integrate optimization strategies, and maintain quality under pressure. The case highlights Treknocom’s strengths in high-volume industrial design, delivering drawings and more innovative building methods.