Speed, Precision & Waste Reduction in Bulk Material Handling Design
Treknocom Helps AEC Firm Deliver Coal Handling Facility with Round-the-Clock Engineering Support
Introduction

With the pressure of EPC deadlines and multiple contractors involved, the Client needed a partner to keep up with high-volume output and suggest innovative improvements.

The Challenge
  • Continuous detailing output needed across global time zones
  • Fabrication waste from inefficient design needed to be reduced
  • Internal teams were stretched thin with cross-discipline coordination
The Solution

Treknocom assembled a multi-member design team and operated on a shift model.

  • Delivered 3D models, detailed drawings, and BOMs
  • Optimized support placements to minimize steel consumption
  • Created clear documentation to reduce RFIs during fabrication
  • Maintained alignment across process, mechanical, and civil teams
Technology Stack
  • AutoCAD – For layout and drafting
  • Advance Steel – For 3D detailing, BOM generation, and clash checks
Result
  • All deliverables completed on schedule
  • Significant reduction in steel waste
  • Lower design costs through efficient workflows
  • Improved downstream communication with fabricators