Success stories
Beating the Peak Load Curve with Responsive Design Support
Treknocom Helps OEM Eliminate Delays and Cost Overruns During High-Volume Engineering Cycles
Introduction

The client was facing unpredictable surges in engineering demand, particularly during quotation and design release phases. They needed flexible execution support without increasing permanent headcount.

The Challenge
  • Repeated bottlenecks during high-volume engineering windows
  • Risk of delayed deliveries and penalty exposure
  • Multiple product lines needed design and documentation simultaneously
  • Internal team unable to scale fast enough
The Solution

Treknocom built a dedicated support model that could ramp up or down on demand.

  • Delivered 2D and 3D designs, BOMs, and drawings for multiple SKUs
  • Aligned work planning with the client’s order intake cycles
  • Provided next-day turnarounds for urgent drawing requests
  • Maintained version control and QA through shared PDM tools
Technology Stack
  • SolidWorks – For 3D modeling and detail engineering
  • AutoCAD – For legacy and vendor-specific drawing formats
Result
  • On-time delivery of every project milestone
  • Cost overruns eliminated during peak loads
  • 24-hour turnaround enabled proactive response
  • Increased capacity without full-time hiring
No items found.