Success stories
Accelerating Biodiesel Plant Engineering with Dedicated Shift-Based Team
Treknocom Helps U.S. Greenfield Project Finish Ahead of Schedule with 40% Cost Savings
Introduction

The client was executing a time-sensitive, large-scale biodiesel facility project and needed round-the-clock engineering support to manage piping, structural, and equipment layout deliverables.

The Challenge
  • Aggressive milestone-driven schedule
  • Design complexity across piping, platforms, and mechanical layouts
  • Multiple file formats required for fabrication and field installation
  • Need for coordination across U.S. and India time zones
The Solution

Treknocom delivered with a shift-based team supported by daily cross-border coordination.

  • Created equipment layouts and 3D piping models using Plant 3D
  • Generated isometrics, spool drawings, and platform layouts
  • Ran clash checks using Navisworks for field buildability
  • Shared progress and QA updates daily via collaborative tools
Technology Stack
  • AutoCAD Plant 3D – For equipment, piping, and platform modeling
  • Navisworks – For clash detection and layout validation
  • Excel – For BOMs, MTOs, and reporting
Result
  • Completed one week ahead of deadline
  • 40% cost savings over in-house projections
  • No escalations—project ran clean through QA and reviews
  • Enabled client to secure next-phase scope with confidence